Some Recent Projects

Parramatta Square - NSW Australia

image1

Parramatta   Square: Part of the Parramatta Square development and   forms part of the University of Western Sydney campus.   


Customer: FIP Electrical   


Project Brief: To design and build a DAS to the MCF requirements to cover all floors including the lifts .   


Solution: A passive DAS consisting of 163 antennas was designed and built. Telstra became the lead operator and   since then Optus and Vodafone have also connected to the DAS.   


Project Compled: 2017    

Melbourne Cricket Ground

image2

Customer: Melbourne Cricket Ground 


Project Brief:   

To design and install a DAS to provide cellular coverage to the stadium to cater for an audience 95,000+ people


Solution:   

A combination of passive and active DAS using ION-M active and passive equipment was designed that can support all operators. The system was design for 14 sectors to cater for the 95,000+ spectators.    


 Project Compled 2016

International House - Barangaroo

image3

Customer: Lend Lease   


Project Brief: The Barangaroo C2  office building is a showcase of sustainable materials in that it is the   first timber, modern framed commercial office building using engineered  timber.   Inside   the exposed wood ceiling, columns and beams created a very unique environment  that challenged CAM to produce a design that matched the aesthetics and  within budget.   


Solution: Using active DAS equipment fed from the central Barangaroo Mobile operators room that also feeds the   other towers ensuring the DAS was suitable for all operators to connect to. 


Project Completion: Ongoing     

Westfield -Coomera

image4

Customer: Vodafone, Telstra, Optus and the new Westfield Coomera shopping Centre on the Gold Coast. 


Project Brief: The Westfield Coomera Shopping Centre was undergoing a major redevelopment and needed to ensure customers have 4G mobile coverage for all operators including inside stores. CAM produced the design for IBC solution suitable for all current technologies and operators.


Solution: A multi-operator DAS was designed and installed to cover all areas of the building using an ION-M active solution with over 200 antennas.


Project Completion: Ongoing


Perth Airport Terminals 3 & 4

image5

Customer: Vodafone & Perth Airport


Project Brief:  To design and install a DAS to provide cellular coverage within the terminals with MiMO coverage in high capacity areas. 


Solution: A hybrid DAS using a mixture of ION-M active equipment and passive equipment was designed that can support all operators. The system capacity, equipment location and coverage design work were based on requirements of all the carriers. 


Project Completion:   

Terminal 3 August 2018

Terminal 4 commencing 2019

Elphinstone Tunnel

image6

Customer: Vodafone and Vic Track. 


Project Brief: To provide cellular coverage within the rail tunnel for all cellular operators and support the Vic Track radio system.


Solution: An external equipment location was found that all operators could use and the old radiating cable was replaced to one that supported a wider frequency range. The system was designed for UHF and cellular bands to be combined and coverage planning considered the handovers to surrounding macro sites.


Project Completed: Ongoing